Design shouldn’t lose its integrity once construction starts. At Park & Patina, design and construction are one team, so every decision is made with the whole project in mind.
The most meaningful remodels often start in the kitchen. Browse our recent work below around Central Florida.
Investment
$170K - $250K
Timeline
14 Weeks
Scope
Kitchen Remodel and Structural Changes
01
Statement marble backsplash, hand-selected by the homeowner and laid out by hand from the center of the hood
02
Custom cabinetry with a built-in microwave drawer in the peninsula
03
Existing vinyl plank flooring carefully lifted and replaced intact
04
New range hood ventilation routed through the side of the house, correcting a builder oversight
Investment
$180K - $250K
Timeline
15 Weeks
Scope
Kitchen Remodel
01
Cherry slab-front cabinetry with push-to-open doors and minimal tab pulls
02
Natural stone backsplash at the sink, plus tile over the coffee area
03
Large terrazzo tile flooring installed over a fully rebuilt subfloor
04
Structural and electrical issues found and properly remediated with an engineer's sign-off
Investment
$550K - $750K
Timeline
6 months
Scope
Kitchen and First Floor Remodel
01
Custom plaster range hood with solid alder beams, built in-house
02
Full guest bath converted into a scullery and coffee bar
03
In-house-built inset cabinetry with hand-measured half-shelves
04
Paneled refrigerator, freezer drawers, and a paneled dishwasher drawer inside the scullery
It depends on the scope, but most of our kitchen remodeling projects run six to twelve weeks. Larger remodels that involve structural changes or relocating utility lines can take longer.
It usually depends on whether we’re working in other parts of the house too. If you stay, we’ll help you set up a temporary cooking and eating area, and we’ll close off the work area with plastic walls, zipper doors, and HEPA filtration. For a kitchen-plus remodel that includes flooring and a bath, we usually recommend moving out, at least for the loudest stretch of demo. Before work begins, we’ll talk honestly about what living at home will look like.
We collect a larger deposit upfront to purchase materials before demolition starts. After that, the payment is split into nine or ten installments, each tied to the start of a major milestone.
We will review your payment schedule and milestones before we begin construction, so you know exactly what to expect.
We sure can! With the right design and a little creativity, we can change how your kitchen feels and functions without moving a single wall.
Yes, absolutely. And to make it even better, it may be possible to do without changing the existing flooring.
Not necessarily. While ceiling-height cabinetry can be a great choice in some kitchens, it isn’t the right solution for every space. We consider the height and proportions of the room, how you use your kitchen, the storage you need, and the overall look you want to create. From there, we’ll recommend a cabinet height that feels intentional and works with the rest of the design.
Every kitchen investment comes down to custom or semi-custom cabinetry, your layout and your scope. These three tiers give you an honest starting point.
Best for a full kitchen rebuilt inside its existing walls, with semi-custom cabinetry and no structural change.
Best for a partial floor plan change alongside a cabinetry and lighting refresh.
Best for a full structural and floor plan change with custom cabinetry throughout.
Every kitchen project starts at a $120,000 minimum budget.
Step 1
Get to Know Us
Browse our kitchen projects to see real investments and timelines, then read the process email we send before your call. That way, our discovery call is all about you and your kitchen.
Step 2
Dream and Discuss
If we're a fit, we visit your home to take a closer look at your kitchen and the spaces around it. We check where the plumbing runs and which walls can move. Then we set a design direction and provide a Design & Development Agreement.
Step 3
Design and Develop
We work out your layout, cabinetry and appliance fit before we build anything. You'll see it finished in 3D renderings. Our trade partners walk the plan too, so surprises show up before the build begins.
Step 4
Build as Planned
We tell you when to order appliances so they're held until install. Dustless tile removal, HEPA filters and zipper doors protect the rest of your home during demo and build. Expect daily photo logs, weekly site walks and a Friday wrap-up.
Step 5
Live in It
We complete the final walkthrough in your new kitchen and resolve the remaining details. What began as drawings and samples is now yours to cook in, backed by the Park & Patina warranty.
01
Design shouldn’t lose its integrity once construction starts. At Park & Patina, design and construction are one team, so every decision is made with the whole project in mind.
02
A beautiful home only works if it works for the people who live there. We design around how you move through your home and what you want to feel long after we’re gone.
03
We’ll share what you need to know while there’s still time to change course, even if it’s not what you hoped to hear. Our job is to protect the bigger picture, not agree with every request.
Carrie S.
Kitchen Remodel
01 / 04
Wes N.
Kitchen Remodel
02 / 04
Sergio P.
Kitchen & Bath Plus
03 / 04
WC F.
Kitchen Remodel
04 / 04