The space he promised his kids, built for the family they've become.
The homeowner and his wife had always pictured their kids doing homework at the kitchen table while a parent cooked, but the space they were in couldn’t hold that picture. Our design team set out to build the one they’d imagined, challenged by a structural change the homeowner was repeatedly told couldn’t be done.
“The entire team are genuine people who truly care. Most importantly, they make sure you are 100% satisfied with their work. They are not satisfied unless you are 100% satisfied. I particularly loved the fact they are an Interior designer and a General contractor all in one. It’s a one-stop-shop so the entire process is seamless.”
— Homeowner
The homeowner hand-selected the statement marble, and our tile setter planned the layout by hand-sketching it directly on the wall, centered at the hood, before a single piece went up.
The peninsula functions like a table with room for each kid. The doorway into the dining room was placed intentionally so they could circle the peninsula and stay close to their dad while he cooks.
A challenging cantilever rebuild made possible an opening that others had deemed impossible.
A custom-mixed navy island brings color into the room without overwhelming it, echoing the coastal palette pulled from the lake view and the family’s home in Puerto Rico.
The existing flooring, recently installed before this project began, was carefully lifted intact and reinstalled with custom transition pieces so he didn't have to pay for new flooring twice.
A new range hood ventilation system was routed out through the side of the house, correcting a range hood the original builder never vented at all.
Top-of-the-line custom cabinetry includes a built-in microwave drawer in the peninsula and a small pull-out display tray at the coffee nook.
The palette pulled from the lake view outside and his family's coastal home in Puerto Rico: coastal blue and white, warmed by natural wood.
General lighting was relocated and the ceilings retextured across the kitchen for a cleaner, more finished feel.
It's a Park & Patina tradition to invite the kids in for a bit of safe demo work when they're old enough, and this bunch was up for it.
01
Before.
The kitchen he’d been living in with his three kids was builder-basic, laid out with no real gathering spot and nowhere for a family to be together while a parent cooked.
It was function without warmth, in a room he wanted to feel like the center of their home instead of one they simply passed through.
02
He came to us without knowing what was structurally possible, but with a clear idea of the life he wanted the space to hold.
Our team saw the opportunity in the closed-off wall between the kitchen and the dining room, the one thing standing between a standard kitchen and the gathering space he was picturing.
03
We opened a doorway into the dining room and designed a large peninsula that works like a table with seating for everyone and a spot for the kids to do homework while dinner comes together a few feet away.
04
Before construction began, he could see the peninsula, the opened wall, and the navy island that would anchor the room, all built around the doorway placement that let the kids circle the island and stay close to their dad while he cooked.
The kitchen the family once dreamed about is the one his family gathers in today. The kids do their homework at the peninsula while dinner cooks a few feet away, exactly as he’d always pictured it.
Yes. We’ll be honest and tell you if something isn’t going to work, but we like to do hard things and use creativity in our projects. If you’ve been told it can’t be done, we’ll try to find a way. In this kitchen, that meant rebuilding the cantilever and reworking the load-bearing structure to create the opening, then venting the new hood through the side of the house to meet code.
Most of our kitchens take about 6 to 12 weeks of construction, depending on the scope. This one took 14, with structural work along the way: rebuilding the cantilever, reworking load-bearing structure, and cutting a new vent through the exterior wall for the hood. The timelines we share are construction only. Design and permitting happen before that.
We have a clear budget conversation up front and revisit it at each phase. As the design comes together, we work in ranges that tighten as the scope firms up.
If a choice would raise your investment significantly, we’ll tell you and show you another option. In this kitchen, fully custom cabinetry was one of the biggest choices. With semi-custom, a similar project would land closer to $150,000 to $210,000. Your final proposal is one lump-sum price with every selection included and no allowances.
We focus on Winter Park, Windermere, Longwood, Lake Mary, Maitland, and the greater Orlando area.
Whether you’re ready to begin or just want to see if we’re the right fit, we’re glad you reached out. Destini will look over your project and get you on the calendar with Sean and Kimberly for a complimentary, no-pressure 15-minute discovery call.
172 W. Warren Ave, Longwood, FL 32750
Monday - Friday · 9:00am - 4:00pm