What started as a roof problem turned into a whole new kitchen.
The homeowner hadn’t planned on a kitchen remodel, but a failing roof, made worse by a Florida hurricane, led to water damage that made it unavoidable. Once we got behind the drywall, we found more than water damage, and what started as a few fixes turned into a full kitchen remodel done the right way.
Most of the cherry slab-front cabinets are push-to-open, with a few minimal tab pulls where they made sense. The result is clean lines with a mid-century feel and almost nothing sticking out to catch on.
A full natural stone slab splash sits behind the sink, with matching stone tile over the new coffee area. The terrazzo is new, poured over a rebuilt subfloor, which is rare. Usually terrazzo is something you uncover and restore.
Moving the washer and dryer to the garage opened up room for a dedicated coffee and wine area with a wine cooler, something the homeowners asked for specifically once they realized the laundry didn’t have to live in the kitchen anymore.
The antique light fixture over the sink came from the homeowner’s own historic-preservation connection, and we built the design around it rather than around a catalog pick.
We finished the edges with a custom bullnose, safer for kids running through, and a cleaner look than a straight-cut transition.
The existing downdraft ventilation stayed, since venting through the roof would have meant reopening work that was already finished.
Large-format clé terrazzo tile went in over a fully rebuilt subfloor, a rare case where we're installing terrazzo rather than restoring it.
The homeowners lived in the house during the 15-week remodel, timing vacations around the work’s most disruptive stretches.
After noticing fire and structural hazards, we paused, brought in an engineer, and resubmitted paperwork to the county before continuing with an adjusted plan.
Aside from moving the washer and dryer out, the kitchen's footprint stayed exactly where it was. Smarter planning, not a full reconfiguration, solved the family's biggest frustration.
01
Before.
Water damage from the roof had worked its way into the drywall, the cabinetry, and the exterior doors, and it only got worse after a hurricane came through. The washer and dryer sat crammed in the kitchen too, which wasn’t doing the layout any favors.
02
Once we opened the walls, we found real problems underneath: an electrical fire hazard, and a load-bearing wall that turned out not to be sound.
We paused the project so an engineer could draw up new plans and get them resubmitted to the county. It pushed the timeline, but making the house safer wasn’t something we were going to skip past.
03
We kept the kitchen’s footprint but moved the washer and dryer to the garage, which freed up room for a coffee and wine area.
We leaned into a mid-century modern direction with cherry slab-front cabinetry, and planned natural stone as a full slab splash at the sink.
04
The homeowners brought ideas of their own. We presented samples based on what they had in mind to land on the cherry and stone combination.
One of our favorite parts: the homeowner sourced an antique light fixture through a historic-preservation connection, and we built the design around it.
Not only does the kitchen look brand new, it’s now safer, with the structural and electrical issues properly remediated and engineer-approved. It’s more functional as well, with the laundry station out of the way and a coffee spot and wine cooler in its place.
Yes. Aside from moving the washer and dryer out to the garage, this kitchen’s footprint stayed exactly where it was, and that move is what gave us the room for the coffee and wine area. The kitchen works differently inside the same footprint.
In this project, the homeowner did bring a fixture for us to work around, and we love that, but it’s not necessary. We present a limited, curated selection with samples, built around our conversations, your mood boards, and the way you intend to use the space.
Staying at home during a remodel depends on the scope of the project and your personal preferences. In the College Park remodel, the homeowners did choose to stay at home, though they coordinated vacations around the busiest parts of construction.
Yes. Our studio is in Longwood, and we work throughout central Florida — Lake Mary, Heathrow, Maitland, College Park, Windermere, Markham Woods, and the northern Orlando area.
Whether you’re ready to begin or just want to see if we’re the right fit, we’re glad you reached out. Destini will look over your project and get you on the calendar with Sean and Kimberly for a complimentary, no-pressure 15-minute discovery call.
172 W. Warren Ave, Longwood, FL 32750
Monday - Friday · 9:00am - 4:00pm